Below is a map and some aerial images of the proposed waste facility (use the 'satellite' button to change to satellite image view and  '+' button to zoom).
Proposed Waste Facility site, 146 Parnell Rd Tomerong
Forground, Proposed waste facility. Background, Jervis Bay and Point Perpendicular.
Picture
A zoom in of the above image showing North Face
Picture
Picture
South bund, truck access to quarry actually drains towards Tomerong Creek.
Picture
Current silt seperation dam approx' 100 m from Tomerong Creek
Picture
Future North wall with possible leak adjacent future 6,000,000 litre leachate dam site
Picture
Shows that the quarry is a shelf shape natrually draining towards Tomerong Creek, not a hole
Picture
Possible masonary waste already being dumped at quarry site along Eastern face
Picture
10 tonne rigid trucks with 15 tonne dog trailors waiting to be loaded
Picture
Quarry hammer mill plant
Picture
Picture
Fracturing of quarry wall as a result of over 50 years of blasting
Picture
Result of a 2009 quarry blast harvesting 1,000's of tonnes of low grade roadbase aggregate in one earth shattering daisy chain explosion. It is proposed that this blasting will continue concurrent and adjacent to the waste facility.